If a carpenter determines that the total length of all walls and partitions is 270', how many lineal feet of 2 x 4 stock are needed to build the sole and double plate?

Prepare for the Modern Carpentry Test with detailed flashcards and multiple choice questions, packed with hints and explanations. Ace your exam with ease!

To calculate the total amount of 2 x 4 stock needed for the sole and double plates, understanding how these elements are used in wall framing is important. Each wall or partition typically requires a sole plate (the bottom horizontal member) and a double top plate (two horizontal members at the top).

Given that the total length of all walls and partitions is 270 feet, you will need to multiply this length by 2 to account for the sole plate (which runs along the bottom of each wall) and the double top plate (which consists of two plates on top of each wall).

When you perform the calculation:

  • Sole plates: 270 feet

  • Double plates: 270 feet x 2 for the two plates on top

This results in:

270 feet (for the sole) + 540 feet (for the double plates) = 810 feet.

However, if we consider that the question specifically asks about the quantity of 2 x 4 stock needed and focuses on the structure for a single layer of top plates (which would be a common choice in simplified calculations), the sole plate would require 270 feet, and the top plate would essentially be doubled. Already multiplying by 2 made it seem like we were